EVMS Agenda 16-Hour

Proudly Serving the EVM Community for 44 Years.
The Leader in Earned Value Management Consulting and Training

EVMS and Project Management Training
EVMS Agenda 16-Hour

Introduction

  • Discussion of workshop approach.
  • Review of notebook contents.

Introduction to the Earned Value Concept

  • Problems with comparing plan versus actual to ascertain performance.
  • Earned Value - An essential parameter.

The Brick Wall

  • An illustrative example of Earned Value methods.

Introduction to Earned Value Management Systems (EVMS)

  • The essential features of a disciplined Earned Value Management System.
  • Objectives and policies of customer-implemented requirements.
  • What are the benefits to the customer?
  • Why should the seller implement an Earned Value Management System?
  • Who uses Earned Value?

Organization and Work Definition

  • WBS defined.
  • Purposes of a WBS.
  • Developing a WBS for standard and non-standard systems.
  • Trade-off assessments on determining the number of levels in the WBS.
  • Negotiating the WBS with the customer.
  • Purpose and importance of defining WBS elements.

Responsibility Assignment

  • Matrixing the organization structure with the WBS.
  • Essential features of a Control Account.
  • Guidance in the identification of Control Account levels and contents.
  • Why the Control Account is the driving factor in system cost and how to minimize this cost.
  • Integrating management subsystems around the WBS and Control Accounts.

Planning, Scheduling and Budgeting

  • Planning, Scheduling and Budgeting - A three-stage iterative process.
  • Proper design of a scheduling system.
  • Horizontal and Vertical Integration.
  • Critical Path.
  • Integrating cost and schedule.
  • Management philosophies on Management Reserve and Undistributed Budgets.

Measuring Accomplishment

  • Description of Work Measurement classifications.
  • Work Packages defined.
  • Discrete Work Measurement techniques.
  • Milestone Characteristics.
  • Rolling Wave - How far in the future must you plan?
  • Summary Planning Packages and their use.

Control Account Plan (EVMS Case Study #3)

A comprehensive, but concise, exercise involving selecting appropriate Earned Value methodologies and calculating the budget and Earned Value for a sample Control Account.

Accounting

  • Why Actual Cost for Work Performed (ACWP) is different from "Actual Costs".
  • Structuring an effective cost control code for accumulating Actual Costs of Work Performed.
  • Common problems and solutions to accumulating material costs for performance measurement.
  • "Enlightened" customer requirements on material costs.
  • How to identify meaningful material variances.

Earned Value Methods (EVMS Case Study #3 Part 2 - Material EV Methods)

An exercise involving the determination of BCWS and BCWP for Material work packages based on selected Earned Value Methods.

Analysis

  • Identifying cost and schedule variances.
  • Methods of portraying variances.

Calculation of Cost and Schedule Variances (EVMS Case Study #4 - Walk Through)

A simplistic exercise in the calculation of Cost and Schedule Variances.

Estimates, Indices and Forecasts

  • Developing Estimates at Completion (EAC)
  • Utilization of Performance Indices

Performance Efficiency Factors and Estimate at Completion (EVMS Case Study #7)

A simplistic exercise requiring the calculation of past and future efficiency factors and an Estimate at Completion forecast.

Variance Analysis

  • Interpreting Cost and Schedule Variance.
  • What constitutes a significant variance?
  • Writing useful variance analysis reports.
  • Comparing past and future efficiency factors.

Reporting

  • What type of financial reports are required and what is their purpose?
  • How to prepare and interpret the various reports.
  • Reconciling funds reports with performance reports - An accuracy check.
  • Differences in reporting requirements.

Highway Case (EVMS Case Study #8 - Walk Through) (Scheduling and Cost)

A reinforcement of variance calculation, performance indices, and EAC analysis.

Revisions and Baseline Maintenance

  • The importance of Baseline Management.
  • Obtaining a balance between a firm baseline and the requirement for replanning flexibility.
  • How the baseline is affected by various changes.
  • Acceptable reasons for retroactive changes to the baseline.

Contract/Project (CBB/PBB) Budget Base Log Preparation (EVMS Case Study #9a)

A concise exercise on how changes affect the budget and how to document them.

Top Management Use of Earned Value Data

  • How Congress measures Federal acquisitions.

Earned Value Management System Development

  • How to implement an EVM System.
  • Common problems and solutions.

EVMS Compliance/Certification, Integrated Baseline Review (IBR) and Surveillance Process

  • Understand the Validation/Certification and Surveillance processes.
  • The Corrective Action process for identifying and correcting issues
  • The Integrated Baseline Review (IBR) timeline, purpose and process
  • Other post Validation/Certification efforts

The Use of Performance Measurement Data

  • Review of course to date

Appendix

Course Evaluation Sheet and Discussion